The developer is proposing to rebuild the structure with updated amenities but the same number of units and floors, on roughly the same footprint as the old building. But it will be better protected from fire, company officials say, because of the firewalls and sprinkler systems that will be installed even in unoccupied spaces like attics and wall cavities.
Source: NorthJersey:Passaic News

http://www.northjersey.com/news/plans-to-rebuild-avalon-at-edgewater-building-nearly-identical-to-original-with-added-fire-safety-upgrades-1.1650993

Share Button